Published Dec 6th, 2024, 12/6/24 5:58 pm
- 223 views, 2 today
- 5
- 0
4
A secondary project from my Chernobyl Stages 1 - 3 map, while ChNPP will continue to be the main project, this will be updated as and when I make progress. For now though, a shell of Units 1 - 4* is done with some details added. A lot more will be added in the future and as with ChNPP, is scaled at 1.66/1. Some inaccuracies are still present as essantially to speed things up I copied my Chernobyl Stage 2 and Stage 3 and have modified them... These will be adressed in future updates however.
Interiors will be added as well, but the aim is to make interiors that can be interchanged and used in both ChNPP and this, to speed progress.
*As with my Units 5 - 6 at Chernobyl, Unit 4 will be based directly off Smolensk U3 and the limited partially finished construction that does exist today, to hopefully recreate something somewhat accurate to how it would have looked.
There will be no download available.
Interiors will be added as well, but the aim is to make interiors that can be interchanged and used in both ChNPP and this, to speed progress.
*As with my Units 5 - 6 at Chernobyl, Unit 4 will be based directly off Smolensk U3 and the limited partially finished construction that does exist today, to hopefully recreate something somewhat accurate to how it would have looked.
There will be no download available.
Progress | 5% complete |
Tags |
6479533
2
Create an account or sign in to comment.