- 5,214 views, 21 today
26
"Poseidon, was the God of the sea. When he was in a good mood, Poseidon created new lands and calm seas for clear sailing. And so, what better way to celebrate the birth of a new year than born on the back of the old fellow himself! May you all have clear sailing in the new year, and all the years to come!" -Captain Micheal Bradford
After 4 years and 5 previous attempts, this is perhaps the best Poseidon I will ever build. I absolutely love this ship's exterior design. Aesthetically, it reminds me of Populuxe / Googie architecture from the 50s and 60s. The interior feels more old-fashioned and vintage, quite different from its space-age exterior design. Currently, the exterior is done, some small things may change here and there, but I'm happy with it. I'm currently working on the interior, though the only major room I have progress on is the Grand Lobby, which I have included pictures of. The Interior will be very accurate to the film, utilizing deleted scenes, deck plans, and of course the movie itself!
MC Specs
Length- 661 Blocks
Width- 89 Blocks
Height- 99 (waterline to funnel)
I am currently planning some future projects, but rest assured, this is my top priority!
PS: I encourage you to watch the film, the Ship and the CGI is stunning!
Progress | 45% complete |
Tags |
4 Update Logs
Update #4 : by La Galaxie 05/09/2024 6:17:43 pmMay 9th
Big updates and changes!
- New Funnel! It's much larger and taller now and pushed more to the front. Features new redesigned "P" logo.
-Added video of a quick outside tour.
-Grand Lobby shops are completed. I will be posting a tour of it on YT soon.
-Redesigned bow thrusters.
-Replaced oak trapdoors with iron trapdoors for a better look.
-New lighting
-Trying to get ballroom completed.
-New pictures of the interior spaces.
-Experimenting w/ cabin designs.
-Film-accurate promenade deck layout lined out.
-Other minor detail changes.
- New Funnel! It's much larger and taller now and pushed more to the front. Features new redesigned "P" logo.
-Added video of a quick outside tour.
-Grand Lobby shops are completed. I will be posting a tour of it on YT soon.
-Redesigned bow thrusters.
-Replaced oak trapdoors with iron trapdoors for a better look.
-New lighting
-Trying to get ballroom completed.
-New pictures of the interior spaces.
-Experimenting w/ cabin designs.
-Film-accurate promenade deck layout lined out.
-Other minor detail changes.
LOAD MORE LOGS
6068558
2
Create an account or sign in to comment.