8
This is the airport that will help strengthen the infrastructure of the Minecraft world. A full featured airport that will rival some of the best airports in the world in terms of scale, architecture and above all luxury (Singapore Changi International, Hong Kong International, Incheon International just to name a few).
The main hall of Terminal 1 is now 50% completed: with the luggage reclaim area still in early progress. The boarding wing of Terminal 1 is still an empty shell, this is where you can make contribution to the construction of the boarding wing: exclusive lounges, restaurants, shops etc. before my brain runs out of ideas! If your suggestion is used in the construction of this airport, your name will be in the credit section of this project posting. So start posting your ideas in the comment!
Progress so far:
100% completion of a maglev train system that extend to Terminal One of the airport. (Terminal Two will be a separate segment)
100% of a pick up/drop off area for cars in front of the Main Hall of T1
50-60% completion of the main hall of T1, check in and custom area completed with baggage reclaim area still in early phase of development
Boarding Hall of T1 around 10% complete, the entire exterior of the hall is ready with the connecting walkways to the Main Hall complete.
Runway layout and air traffic control 0% complete
The main hall of Terminal 1 is now 50% completed: with the luggage reclaim area still in early progress. The boarding wing of Terminal 1 is still an empty shell, this is where you can make contribution to the construction of the boarding wing: exclusive lounges, restaurants, shops etc. before my brain runs out of ideas! If your suggestion is used in the construction of this airport, your name will be in the credit section of this project posting. So start posting your ideas in the comment!
Progress so far:
100% completion of a maglev train system that extend to Terminal One of the airport. (Terminal Two will be a separate segment)
100% of a pick up/drop off area for cars in front of the Main Hall of T1
50-60% completion of the main hall of T1, check in and custom area completed with baggage reclaim area still in early phase of development
Boarding Hall of T1 around 10% complete, the entire exterior of the hall is ready with the connecting walkways to the Main Hall complete.
Runway layout and air traffic control 0% complete
Progress | 25% complete |
Tags |
1 Update Logs
Update #1 : by Dayday95 08/15/2012 1:00:17 pmAug 15th, 2012