Published Aug 28th, 2022, 8/28/22 11:10 am
- 5,522 views, 2 today
- 694 downloads, 0 today
214
Su-33 by T-14_Armata and SWguren
Mig-29k and Ka-27 by BABAofficial
all slightly modified by me
Admiral Flota Sovetskogo Soyuza Kuznetsov (Russian: Адмира́л фло́та Сове́тского Сою́за Кузнецо́в "Admiral of the Fleet of the Soviet Union Kuznetsov", originally the name of the fifth Kirov-class battlecruiser) is an aircraft carrier (heavy aircraft cruiser in Russian classification) serving[clarification needed] as the flagship of the Russian Navy. She was built by the Black Sea Shipyard, the sole manufacturer of Soviet aircraft carriers, in Nikolayev within the Ukrainian Soviet Socialist Republic (SSR) and launched in 1985, becoming fully operational in the Russian Navy in 1995. The initial name of the ship was Riga; it was launched as Leonid Brezhnev, embarked on sea trials as Tbilisi, and finally named Admiral Flota Sovetskogo Soyuza Kuznetsov after Admiral of the fleet of the Soviet Union Nikolay Gerasimovich Kuznetsov.[7]
She was originally commissioned in the Soviet Navy, and was intended to be the lead ship of the two-ship Admiral Kuznetsov class. However, her sister ship Varyag was still incomplete when the Soviet Union disbanded in 1991.[8] The second hull was eventually sold by Ukraine to China, completed in Dalian and commissioned as Liaoning.[9]
As of July 2022, Admiral Kuznetsov is out of service for a refit in Murmansk. In November 2018, it was damaged by a falling 70-ton crane from the floating dry dock PD-50 and a fire that killed two during the refit. The dry dock, which sank due to a power outage while holding Admiral Kuznetsov,[10] was vital to repairing the carrier,[11] which is not expected to re-enter service until 2022 at the earliest.[12] In 2021, the Vice President of the United Shipbuilding Corporation (USC), Vladimir Korolev, told the TASS news agency that the vessel was expected to begin post-repair sea trials in mid-2023 and rejoin the fleet later that year,[13] although this may have been pushed back a year or more due to delays.[14] In May 2022 it was reported that repairs to the vessel were scheduled for completion in Murmansk in September 2022[15] but after flaws were found in the work, the date for the return to service was pushed back to at least 2024.
*Built in 1.17, if you put it in old version like 1.15 or 1.12 some blocks may disappear
Mig-29k and Ka-27 by BABAofficial
all slightly modified by me
Admiral Flota Sovetskogo Soyuza Kuznetsov (Russian: Адмира́л фло́та Сове́тского Сою́за Кузнецо́в "Admiral of the Fleet of the Soviet Union Kuznetsov", originally the name of the fifth Kirov-class battlecruiser) is an aircraft carrier (heavy aircraft cruiser in Russian classification) serving[clarification needed] as the flagship of the Russian Navy. She was built by the Black Sea Shipyard, the sole manufacturer of Soviet aircraft carriers, in Nikolayev within the Ukrainian Soviet Socialist Republic (SSR) and launched in 1985, becoming fully operational in the Russian Navy in 1995. The initial name of the ship was Riga; it was launched as Leonid Brezhnev, embarked on sea trials as Tbilisi, and finally named Admiral Flota Sovetskogo Soyuza Kuznetsov after Admiral of the fleet of the Soviet Union Nikolay Gerasimovich Kuznetsov.[7]
She was originally commissioned in the Soviet Navy, and was intended to be the lead ship of the two-ship Admiral Kuznetsov class. However, her sister ship Varyag was still incomplete when the Soviet Union disbanded in 1991.[8] The second hull was eventually sold by Ukraine to China, completed in Dalian and commissioned as Liaoning.[9]
As of July 2022, Admiral Kuznetsov is out of service for a refit in Murmansk. In November 2018, it was damaged by a falling 70-ton crane from the floating dry dock PD-50 and a fire that killed two during the refit. The dry dock, which sank due to a power outage while holding Admiral Kuznetsov,[10] was vital to repairing the carrier,[11] which is not expected to re-enter service until 2022 at the earliest.[12] In 2021, the Vice President of the United Shipbuilding Corporation (USC), Vladimir Korolev, told the TASS news agency that the vessel was expected to begin post-repair sea trials in mid-2023 and rejoin the fleet later that year,[13] although this may have been pushed back a year or more due to delays.[14] In May 2022 it was reported that repairs to the vessel were scheduled for completion in Murmansk in September 2022[15] but after flaws were found in the work, the date for the return to service was pushed back to at least 2024.
*Built in 1.17, if you put it in old version like 1.15 or 1.12 some blocks may disappear
Progress | 100% complete |
Tags |
tools/tracking
5695141
2
admiral-kuznetsov-aircraft-carrier-1-1-scale-1-year-planetminecraft-anniversary
Create an account or sign in to comment.