Published Sep 2nd, 2022, 9/2/22 8:30 pm
- 404 views, 2 today
- 37 downloads, 0 today
35
This was a bridge I built mostly on 6/14/2022, although I slowly made small tweaks after that. It took 1 - 2 hours to build with worldedit.
This bridge consists of a four lane divided highway, two railroad tracks, and a pedestrian/bike path.
This bridge consists of a four lane divided highway, two railroad tracks, and a pedestrian/bike path.
Progress | 100% complete |
Tags |
tools/tracking
5700765
2
bridge-5700765
Create an account or sign in to comment.