Published Jun 17th, 2016, 6/17/16 4:20 pm
- 365 views, 1 today
- 40 downloads, 0 today
159
Update 7
The week I have powered through to try and get the wall basics complete. Each section needed the foundation layer, the roof top and the detailing. I was also able to add the two ramps on the left and right sides of the walls so I can begin work on the side gates with the same design as the back gate. I also spent a lot of time this week clearing out some land around where I was going to be placing the wall. Although the wall took the most time to build, clearing land was still a priority as it would provide areas to build in later on.
Next week I am going to have to work through to complete the wall by adding in the rest of the wall towers on the corners of the structure, then I have to add the side gates, the main gates and then finally finish the area by creating the main structure within this area. Hopefully after that I should be able to move onto the surrounding area around the this walled area.
Social Media
In order to stay up to date with this series, you may want to follow me on twittter at @Farrahs_MC where I will be posting extra images of my progress or you may want to subscribe to me on YouTube at https://www.youtube.com/user/FarrahsSplintech in order to keep up with my build tutorials and timelapses.
The week I have powered through to try and get the wall basics complete. Each section needed the foundation layer, the roof top and the detailing. I was also able to add the two ramps on the left and right sides of the walls so I can begin work on the side gates with the same design as the back gate. I also spent a lot of time this week clearing out some land around where I was going to be placing the wall. Although the wall took the most time to build, clearing land was still a priority as it would provide areas to build in later on.
Next week I am going to have to work through to complete the wall by adding in the rest of the wall towers on the corners of the structure, then I have to add the side gates, the main gates and then finally finish the area by creating the main structure within this area. Hopefully after that I should be able to move onto the surrounding area around the this walled area.
Social Media
In order to stay up to date with this series, you may want to follow me on twittter at @Farrahs_MC where I will be posting extra images of my progress or you may want to subscribe to me on YouTube at https://www.youtube.com/user/FarrahsSplintech in order to keep up with my build tutorials and timelapses.
Progress | 100% complete |
Tags |
3721814
2
Create an account or sign in to comment.