- 7,233 views, 2 today
47
I created this project a few years ago and later abandoned it. A month ago I decided to re-build this in hardcore survival at 1.17.1 version.
Build log:
Day 219: Survival base is mostly complete, Elytra is acquired. The base contains a barn with animal pens, small crop and pumpkin farm, a villager breeder, and iron farm. and an underground mob farm. There is is a main storage and mineshaft buildings under the central point of the future cathedral.
Day 387: Added a big wool farm for all colors and a few villager trading post + built the main platforms for the cathedral.
Day 471: Western nave of the cathedral is completed.
Day 556: Top point reached. The spire is mostly made of copper, it will look much better oxidized.
Day 740: Cathedral external design is completed, spire i now oxidized.
Day 794: I completed the cathedral internals with altars, confession room, organ, benches etc...
Day 927 Added the "Sleeping Beauty" tower. Most of the southern sections of the abbey is now complete (The exterior only :( )
Day 984 Completed the Cloisters and the Old Dormitory building.
Day 1168 NW abbey garden and surrounding structures are completed.
Build log:
Day 219: Survival base is mostly complete, Elytra is acquired. The base contains a barn with animal pens, small crop and pumpkin farm, a villager breeder, and iron farm. and an underground mob farm. There is is a main storage and mineshaft buildings under the central point of the future cathedral.
Day 387: Added a big wool farm for all colors and a few villager trading post + built the main platforms for the cathedral.
Day 471: Western nave of the cathedral is completed.
Day 556: Top point reached. The spire is mostly made of copper, it will look much better oxidized.
Day 740: Cathedral external design is completed, spire i now oxidized.
Day 794: I completed the cathedral internals with altars, confession room, organ, benches etc...
Day 927 Added the "Sleeping Beauty" tower. Most of the southern sections of the abbey is now complete (The exterior only :( )
Day 984 Completed the Cloisters and the Old Dormitory building.
Day 1168 NW abbey garden and surrounding structures are completed.
Progress | 30% complete |
Tags |
4 Update Logs
Update #4 : by meszib 10/30/2021 6:44:04 pmOct 30th, 2021
NW corner is ready for the terraforming work.
LOAD MORE LOGS
tools/tracking
3229413
2
mont-saint-michel
Create an account or sign in to comment.
Are you still building on this? Would be awesome to see some progress^^