19
Wooooowho!
I haven't posted my recent projects for months since I have a Public Exam, sorry about that!~
I built this suspension bridge for my server, connecting 2 separated Mainland, so I call this bridge:
Bridge of Friendship
So every tower has painted a word "FRIENDSHIP"
Information of this bridge:
Main Span: 2210m (blocks)
Total Length: 2900m (only 2510m built) when completed
Upper Deck: 6 Lane Traffic (Hopefully for Horses in 1.6)
Sheltered Lower Deck: 4 Lane Traffic + 2 Metro Railways
This bridge is still under construction, so the data and design is not final.
Progress and Method of this bridge construction:
1. Collecting data from environment (Done)
2. Calculating distance (Done)
3. Bridge design (Done)
4, Construct 4 Towers (Done)
5. Connecting Wires (total 4 Done)
6. Build a 10m Deck Segment on both side (Done)
7. Connect both side by building the Segments inwards (Done)
8. Railway and Road Connections (Not Done)
Ooo, I am thirsty of diamonds, please give me one if you like this..
Address: NHT-PNS.no-ip.org:1027
Dynmap: NHT-PNS.no-ip.org:8123
I haven't posted my recent projects for months since I have a Public Exam, sorry about that!~
I built this suspension bridge for my server, connecting 2 separated Mainland, so I call this bridge:
Bridge of Friendship
So every tower has painted a word "FRIENDSHIP"
Information of this bridge:
Main Span: 2210m (blocks)
Total Length: 2900m (only 2510m built) when completed
Upper Deck: 6 Lane Traffic (Hopefully for Horses in 1.6)
Sheltered Lower Deck: 4 Lane Traffic + 2 Metro Railways
This bridge is still under construction, so the data and design is not final.
Progress and Method of this bridge construction:
1. Collecting data from environment (Done)
2. Calculating distance (Done)
3. Bridge design (Done)
4, Construct 4 Towers (Done)
5. Connecting Wires (total 4 Done)
6. Build a 10m Deck Segment on both side (Done)
7. Connect both side by building the Segments inwards (Done)
8. Railway and Road Connections (Not Done)
Ooo, I am thirsty of diamonds, please give me one if you like this..
Additional Notes
This bridge is located in my server:Address: NHT-PNS.no-ip.org:1027
Dynmap: NHT-PNS.no-ip.org:8123
Progress | 80% complete |
Tags |
tools/tracking
2161100
2
my-first-suspension-bridge-bridge-of-friendship
Create an account or sign in to comment.