• 1/19/19 8:27 pm
- 3.1k views • 0 today
- save_alt 235 downloads
- Progress
- 75% complete
139
The nemisis is complete, but the autobot base is still in the works.
keep in mind the nemisis was built in transformer to structure scale, not human to structure scale
and the autobot base is human to structure scale
i hope you enjoy the map! :)
keep in mind the nemisis was built in transformer to structure scale, not human to structure scale
and the autobot base is human to structure scale
i hope you enjoy the map! :)
More like this
4185202
2



Have something to say?