- 4,290 views • 1 today
- 16
- 10
- 8
39
<-- Welcome to Lambda Nuclear power plant (LdNPP) -->
This is a fully functioning (unmodded) nuclear power plant with 4 working reactors.
This map is to honour those who lost their lives during the liquidation of the Chernobyl nuclear power plant.
Real ChNPP blueprints were used while making this power plant.
Map Backstory
In the year 202X, Nuclear powerplants are being phased out and replaced by the newer and better fusion power plants. The Lambda Corporation is a private company that produces fusion and fission based weapons as well as power plants. The Lambda Nuclear power plant is one of the few remaining plants with the experimental RBMK-4422C. This map takes place one year before the plants scheduled decommission. The LdNPP is the flagship nuclear powerplant of the Lambda Corporation. Now watch the LdNPP on its knees as it soon follows the nuclear age in to its grave.
This is a fully functioning (unmodded) nuclear power plant with 4 working reactors.
This map is to honour those who lost their lives during the liquidation of the Chernobyl nuclear power plant.
Real ChNPP blueprints were used while making this power plant.
Map Backstory
In the year 202X, Nuclear powerplants are being phased out and replaced by the newer and better fusion power plants. The Lambda Corporation is a private company that produces fusion and fission based weapons as well as power plants. The Lambda Nuclear power plant is one of the few remaining plants with the experimental RBMK-4422C. This map takes place one year before the plants scheduled decommission. The LdNPP is the flagship nuclear powerplant of the Lambda Corporation. Now watch the LdNPP on its knees as it soon follows the nuclear age in to its grave.
Currently Completed:
Unit 1
Unit 2
Unit 3
Unit 4
Utility building A
Utility Building B
TG 1-2
TG 3-4
Currently Working on:
Turbine Hall (Full construction)
- Personnel areas
This map will have features such as:
-Realistic reactor damage system
-Functioning control room
-Interactable machines and systems
-Full interior
-Chernobyl Liquidation memorial
Project Started: 22/7/2021
Project Finished: not completed
| Progress | 65% complete |
| Tags |
1 Update Logs
Preview Update #1 : by MRmctratt 06/01/2022 10:51:42 amJune 1, 2022 @ 2:51 pm UTC
Added
- Finished Turbine unit 3 and 4.
- Built more rooms for reactor sublevel 1.
Changed
- Reworked Utility building 1st floor corridor.
- Reworked Logistics Centre.
- Remade Turbine hall exterior.
Ive finally been able to come back and work on this project after 2 months of uninterrupted school work and exams, Ive also gotten someone who can help me work on the plant so that I can roll out updates easier and faster.
- Finished Turbine unit 3 and 4.
- Built more rooms for reactor sublevel 1.
Changed
- Reworked Utility building 1st floor corridor.
- Reworked Logistics Centre.
- Remade Turbine hall exterior.
Ive finally been able to come back and work on this project after 2 months of uninterrupted school work and exams, Ive also gotten someone who can help me work on the plant so that I can roll out updates easier and faster.
5527008
2


Have something to say?
Ah yes, less than a year.