I present to your attention a map of the Soviet nuclear power plant "Zapadnogorskaya NPP". The power plant was implemented in the image and likeness of existing Ukrainian nuclear power plants, in particular, South Ukrainian and Zaporozhye. The power plant operates on two reactors of the VVER-1000 type (PWR-1000 analogue) and together generates 2,089 megawatts of clean electricity.
I have been building this map for about 2 months in total and now it is in the middle stage of completion. At the moment, almost all the frames of the necessary buildings and workshops have been built, but the interior is fully present only in the reactor buildings. According to my calculations, the completion of the construction should take at least another 6-7 months. I will update the map with every significant innovation. Below is a list of buildings in accordance with the master plan of the power plant (highlighted in orange - unfinished or currently missing buildings / structures):
1 - Reactor Unit (twin)
2 - Engine Room (twin)
3 - Outdoor transformer devices
4 - Administrative building
5 - Diesel-engined power generating unit
6 - Engineering laboratory building
7 - Sanitary building
8 - Combined auxiliary complex
9 - Cooling tower
10 - Collection point and water supply to cooling towers
11 - Circulating block pumps for cooling water
12 - Start-up boiler room
13 - Oil industry of fuels and lubricants
14 - Switchyard-1 (500kV)
15 - Switchyard-2 (320kV)
16 - Special water treatment facility
17- Spillway
18 -Liquid radioactive waste storage facility
19 - Solid radioactive waste storage facility
if you have any questions or suggestions, write to me personally.
Update: the project is completely abandoned and will never be updated. Thanks for your understanding
I have been building this map for about 2 months in total and now it is in the middle stage of completion. At the moment, almost all the frames of the necessary buildings and workshops have been built, but the interior is fully present only in the reactor buildings. According to my calculations, the completion of the construction should take at least another 6-7 months. I will update the map with every significant innovation. Below is a list of buildings in accordance with the master plan of the power plant (highlighted in orange - unfinished or currently missing buildings / structures):
1 - Reactor Unit (twin)
2 - Engine Room (twin)
3 - Outdoor transformer devices
4 - Administrative building
5 - Diesel-engined power generating unit
6 - Engineering laboratory building
7 - Sanitary building
8 - Combined auxiliary complex
9 - Cooling tower
10 - Collection point and water supply to cooling towers
11 - Circulating block pumps for cooling water
12 - Start-up boiler room
13 - Oil industry of fuels and lubricants
14 - Switchyard-1 (500kV)
15 - Switchyard-2 (320kV)
16 - Special water treatment facility
17- Spillway
18 -Liquid radioactive waste storage facility
19 - Solid radioactive waste storage facility
if you have any questions or suggestions, write to me personally.
Update: the project is completely abandoned and will never be updated. Thanks for your understanding
Progress | 60% complete |
Tags |
3 Update Logs
Update #3 : by U23M1 01/15/2021 3:25:30 amJan 15th, 2021
Small map update. Subsequent updates are postponed indefinitely.
- Liquid radioactive waste storage facility was built.
- Some decorative landscape changes
- Liquid radioactive waste storage facility was built.
- Some decorative landscape changes