- 4
- 4
- 3
Bedrock Edition
15
Welcome to Tyson Junior High! Home of the fighting Lions. (fictional school)
This school map will include 6-8th grade. 6th grade will have its own area isolated from thje rest of the grades. This school will include over 60+ classrooms, A library, 2 Practice gyms, and 1 main gym, a cafetorium, art rooms, band, orchestra, choir rooms, and much more!
More detail:
6th grade will have its own area (gym, cafeteria, and classrooms); however, as of now all electives are in the main building, and the library. The 6th grade area is adjacent to the main building and is seperated by a door. The main campus consists of all the electives (fine arts, cte, etc.), 2 gyms (1 main gym, and a practice gym), a larger cafeteria for 7-8th grade, library, cte classrooms, and more!
Updates will be provided weekly.
Progress is being made. To be finished by Late 2026- Early 2027
To give you a perspective on how big this school is, if you downloaded my Reynolds Elementary Map (still available), its double the size of that school (maybe even larger).
This school map will include 6-8th grade. 6th grade will have its own area isolated from thje rest of the grades. This school will include over 60+ classrooms, A library, 2 Practice gyms, and 1 main gym, a cafetorium, art rooms, band, orchestra, choir rooms, and much more!
More detail:
6th grade will have its own area (gym, cafeteria, and classrooms); however, as of now all electives are in the main building, and the library. The 6th grade area is adjacent to the main building and is seperated by a door. The main campus consists of all the electives (fine arts, cte, etc.), 2 gyms (1 main gym, and a practice gym), a larger cafeteria for 7-8th grade, library, cte classrooms, and more!
Updates will be provided weekly.
Progress is being made. To be finished by Late 2026- Early 2027
To give you a perspective on how big this school is, if you downloaded my Reynolds Elementary Map (still available), its double the size of that school (maybe even larger).
11 Update Logs
Major Progress : by MatiBuilds 10/08/2026 9:09:42 pmOctober 9 @ 1:09 am UTC
- Roofing on library
- More exterior work
- Revamped 6th grade center entrance
- Skylights in Main Hall added
- And much more!
LOAD MORE LOGS
More like this
6812927
2

Have something to say?