Welcome to Tyson Junior High! Home of the fighting Lions. (fictional school)
This school map will include 6-8th grade. 6th grade will have its own area isolated from thje rest of the grades. This school will include over 60+ classrooms, A library, 2 Practice gyms, and 1 main gym, a cafetorium, art rooms, band, orchestra, choir rooms, and much more!
More detail:
6th grade will have its own area (gym, cafeteria, and classrooms); however, as of now all electives are in the main building, and the library. The 6th grade area is adjacent to the main building and is seperated by a door. The main campus consists of all the electives (fine arts, cte, etc.), 2 gyms (1 main gym, and a practice gym), a larger cafeteria for 7-8th grade, library, cte classrooms, and more!
Updates will be provided weekly.
This campus is expected to be finished by August 2026. Opening for the 2026-27 School year.
I am going on a fast pace because i have time off. I think i may be able to finish by early august, or mid august.
To give you a perspective on how big this school is, if you downloaded my Reynolds Elementary Map (still available), its double the size of that school (maybe even larger).
NOTE: This school WILL include mods, mainly furniture mods. (I may have a mod-free version we will see).
This school map will include 6-8th grade. 6th grade will have its own area isolated from thje rest of the grades. This school will include over 60+ classrooms, A library, 2 Practice gyms, and 1 main gym, a cafetorium, art rooms, band, orchestra, choir rooms, and much more!
More detail:
6th grade will have its own area (gym, cafeteria, and classrooms); however, as of now all electives are in the main building, and the library. The 6th grade area is adjacent to the main building and is seperated by a door. The main campus consists of all the electives (fine arts, cte, etc.), 2 gyms (1 main gym, and a practice gym), a larger cafeteria for 7-8th grade, library, cte classrooms, and more!
Updates will be provided weekly.
This campus is expected to be finished by August 2026. Opening for the 2026-27 School year.
I am going on a fast pace because i have time off. I think i may be able to finish by early august, or mid august.
To give you a perspective on how big this school is, if you downloaded my Reynolds Elementary Map (still available), its double the size of that school (maybe even larger).
NOTE: This school WILL include mods, mainly furniture mods. (I may have a mod-free version we will see).
| Progress | 20% complete |
| Tags |
4 Update Logs
Second floor of 6th grade area is almost finished. : by MatiBuilds 06/12/2026 1:27:13 amJune 12 @ 5:27 am UTC
Second floor of 6th grade area is near completion.
Brick tiles and other masonry have also begun to be placed around the exterior and interior portions where necessary.
Here is more info about this area:
Brick tiles and other masonry have also begun to be placed around the exterior and interior portions where necessary.
Here is more info about this area:
- 1 Gym.
- 1 Cafeterioum (With stage).
- 5 Science labs.
- 15 Standard Classrooms. (5 for each subject: Math, English, and Social Studies.)
- 3 Flex Areas in classroom pods.
- LGI (May be cancelled).
- Own entry area with parking lot.
- And much more!
LOAD MORE LOGS
6812927
2


Have something to say?