• 6/12/25 4:49 pm
- 9.3k views • 16 today
- save_alt 2.3k downloads • 1 today
- Progress
- 65% complete
26
A project I started during covid quarantine, but never fully finished. I worked on it until early 2025, so about 5 years. The exterior is fully complete, but the interior is only about 50%.
Notable areas that are complete include:
Hangar bay
Casino
8 guest suites
Work room
Master suite
Parkour arena
Bowling alley
Crew barracks
Command deck
Escape room/Med bay
Walk-through aquarium
Creeper museum (Creeperflage texture pack recommended but not required)
Library/enchanting area
Nature sanctuary
Interactive redstone museum
Notable areas that are complete include:
Hangar bay
Casino
8 guest suites
Work room
Master suite
Parkour arena
Bowling alley
Crew barracks
Command deck
Escape room/Med bay
Walk-through aquarium
Creeper museum (Creeperflage texture pack recommended but not required)
Library/enchanting area
Nature sanctuary
Interactive redstone museum
More like this
6644638
2



Have something to say?