- 10,379 views, 7 today
- 806 downloads, 1 today
64
This is my Beijing Daxing International Airport build, feel free to use it in your city.
But put me in the credits, Please.
If you enjoy it please leave a diamond.
If you like this build, please go also check out my other builds.
Thanks for all the support.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Current downloadable version: 2
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Stay updated on the project:
![Beijing Daxing International Airport 1:1 scale (1.16.5) Minecraft Map](https://picfiles.alphacoders.com/478/478037.png)
North Terminal: (Completion 90%)
- Exterior is now complete only need to add some minor details.
- For the Interieur, I am not working on it now. I would like to finish the map before starting on the interiors of buildings.
But always feel free to download the map and design the interior. If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
Satellite Hall: (Completion 90%)
- Exterior is now complete only need to add some minor details.
- For the Interieur, I am not working on it now. I would like to finish the map before starting on the interiors of buildings.
But always feel free to download the map and design the interior. If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
Hangers: (Completion 90%)
South Terminal: (Completion 5%)
- Construction has started !!
Rest of the map: (completion 35%)
All buildings will remain blank (white) for now. I'm going to focus on the rest first.
Feel free to download the map and design the buildings.
(The buildings have to have a use for an airport, don't go put residential buildings in an airport!!!!)
If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
I still need to be built:
- Roads
- Buildings
- More green zones (forest)
- Bridges
- Guide lines for the aircrafts
- Lights and lines for the runways.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Info:
Airport size and location:
Construction of Daxing International Airport began in December 2014 and the terminal’s steel structure was ready in June 2017. The air hub has an area of 18 square kilometers. Its budget was roughly US$14 billion. The airport expects to receive 630,000 flights a year. Totally 40,000 people worked on the project. The frame of the airport contains 52,000 tonnes of steel. Its roof weighs 30,000 tonnes and has an area equal to 25 football pitches. Four runways are already operating, and their number will eventually increase to seven.
The new airport is located around 40 kilometers from Beijing. Passengers can get to it from the megapolis by trains that reach speeds of up to 349 kilometers an hour. Residents of 28 other cities can travel to the airport on high-speed rail lines and highways that are currently under construction. Underneath the airport terminal, a transportation center will be opened with rail and road junctions.
The design concept is founded in traditional Chinese architecture, with a central courtyard surrounded by all other spaces. The airport’s six elongated branches are connected by a central hub.
The building’s form follows its function: the airport’s shape helps to easily direct all passengers from the departure, arrival, and transfer zones to the central hub, where all services are concentrated. Thanks to this design, it takes passengers less time to get from the registration area to their gate. The distance from the central hub to the furthest gate is just 600 meters and takes just eight minutes to walk. Baggage arrives 13 minutes after the plane lands.
Credits:
Render Programs:
Avoyd Voxel Editor : https://www.avoyd.com/
Chunky : https://chunky.llbit.se/
Resourcepack:
While building I use: https://www.planetminecraft.com/texture-pack/bare-bones/
For renders I use: https://www.planetminecraft.com/texture-pack/greenfield-official-texture-pack/
But put me in the credits, Please.
If you enjoy it please leave a diamond.
If you like this build, please go also check out my other builds.
Thanks for all the support.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Current downloadable version: 2
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Stay updated on the project:
![Beijing Daxing International Airport 1:1 scale (1.16.5) Minecraft Map](https://picfiles.alphacoders.com/478/478034.jpg)
![Beijing Daxing International Airport 1:1 scale (1.16.5) Minecraft Map](https://picfiles.alphacoders.com/478/478037.png)
North Terminal: (Completion 90%)
- Exterior is now complete only need to add some minor details.
- For the Interieur, I am not working on it now. I would like to finish the map before starting on the interiors of buildings.
But always feel free to download the map and design the interior. If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
Satellite Hall: (Completion 90%)
- Exterior is now complete only need to add some minor details.
- For the Interieur, I am not working on it now. I would like to finish the map before starting on the interiors of buildings.
But always feel free to download the map and design the interior. If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
Hangers: (Completion 90%)
South Terminal: (Completion 5%)
- Construction has started !!
Rest of the map: (completion 35%)
All buildings will remain blank (white) for now. I'm going to focus on the rest first.
Feel free to download the map and design the buildings.
(The buildings have to have a use for an airport, don't go put residential buildings in an airport!!!!)
If it is really good I can maybe add it to my project and add you as a builder of the project in the credits.
I still need to be built:
- Roads
- Buildings
- More green zones (forest)
- Bridges
- Guide lines for the aircrafts
- Lights and lines for the runways.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------
Info:
Airport size and location:
Construction of Daxing International Airport began in December 2014 and the terminal’s steel structure was ready in June 2017. The air hub has an area of 18 square kilometers. Its budget was roughly US$14 billion. The airport expects to receive 630,000 flights a year. Totally 40,000 people worked on the project. The frame of the airport contains 52,000 tonnes of steel. Its roof weighs 30,000 tonnes and has an area equal to 25 football pitches. Four runways are already operating, and their number will eventually increase to seven.
The new airport is located around 40 kilometers from Beijing. Passengers can get to it from the megapolis by trains that reach speeds of up to 349 kilometers an hour. Residents of 28 other cities can travel to the airport on high-speed rail lines and highways that are currently under construction. Underneath the airport terminal, a transportation center will be opened with rail and road junctions.
Airport design:
Zaha Hadid, an Iraqi-British architect with worldwide acclaim, worked on the project until her death in 2016, infusing the futuristic design with the likeness of a phoenix, while the Chinese media have nicknamed the airport “starfish” due to its shape.The design concept is founded in traditional Chinese architecture, with a central courtyard surrounded by all other spaces. The airport’s six elongated branches are connected by a central hub.
The building’s form follows its function: the airport’s shape helps to easily direct all passengers from the departure, arrival, and transfer zones to the central hub, where all services are concentrated. Thanks to this design, it takes passengers less time to get from the registration area to their gate. The distance from the central hub to the furthest gate is just 600 meters and takes just eight minutes to walk. Baggage arrives 13 minutes after the plane lands.
Credits:
Render Programs:
Avoyd Voxel Editor : https://www.avoyd.com/
Chunky : https://chunky.llbit.se/
Resourcepack:
While building I use: https://www.planetminecraft.com/texture-pack/bare-bones/
For renders I use: https://www.planetminecraft.com/texture-pack/greenfield-official-texture-pack/
Progress | 60% complete |
Tags |
10 Update Logs
Update #10 : by shadowESH 10/11/2021 4:13:05 amOct 11th, 2021
Version 2 is now available !!
- Updated the info in the description go check it out.
- Updated the info in the description go check it out.
LOAD MORE LOGS
4938164
2
Create an account or sign in to comment.
Also send me the link too the post in a private message, please
btw, im just asking... when is version 2 coming?
And change the description, I just putted up some screenshots to show the progress.
I build so fast because I am using "worldedit". I am not that good of a builder tho, especially for interior.
But thanks for the support!
If you really cant open it just download winrar then.
There are two more buildings that are part of the main airport buildings.
Plus I am not much of a interieur designer so It will probably take a while.