• 8/15/25 3:13 am
- 988 views • 1 today
- Progress
- 100% complete
- 3
- 1
- 4
131
After 3 months of planning and building, I finally completed this interchange. This highway connects NE 1 to Highway 12/Almaden Rd. Before the tunnel, I built an elevated highway and the interchange was designed around that. The problem was lack of space, many design constraints, and it was just an eyesore. I decided after 2 years of keeping the elevated highway, I demolished it in favor of a tunnel. Additionally, changes to the frontage road were made.
This interchange has 16 ramps and 5 tunnels. The main NE 1 tunnel has 2 bores with 2 additional bores as exit and entry points. The 5th tunnel is part of the highway 12 --> Almaden Rd connector. This interchange is between the starting point of highway 12 and end point of Almaden Rd (and vice versa). There are 2 automated toll collection gantries (one on each side).
Let me know what you guys think!
Note: This project is part of a city project I am doing. The world side its 10km x 10km.
This interchange has 16 ramps and 5 tunnels. The main NE 1 tunnel has 2 bores with 2 additional bores as exit and entry points. The 5th tunnel is part of the highway 12 --> Almaden Rd connector. This interchange is between the starting point of highway 12 and end point of Almaden Rd (and vice versa). There are 2 automated toll collection gantries (one on each side).
Let me know what you guys think!
Note: This project is part of a city project I am doing. The world side its 10km x 10km.
More like this
6702751
2


Have something to say?