• 6/10/24 1:54 am
- 542 views • 0 today
- Progress
- 100% complete
- 1
- 0
131
As I said, I've restarted the build. So far, I have completed this 0.5 km long bridge. Additionally, I have completed 1.5 km of road (8.5 km left). This is a toll road (I will have 3-4 plazas across 10 km). I hope to finish this expressway in the next 5 months.
More like this
6301441
2


Have something to say?