216
A modern-style vertical lift bridge powered by command blocks. Four towers lift the central span of the bridge. The length of the lifted span is 31m. When raised, it allows for a clearance of 16m, up from 5m. There are 2 control rooms that allow it to be safely controlled from both sides (it can be raised from one side and lowered from the other). When the lever is switched, the light in the control room turns on, a barrier is raised across the road, the bridge is lifted, and then the light turns off indicating it is safe to pull the lever again to lower the bridge. The command blocks are hidden inside the towers.
Download the east-west oriented schematic using main link on right and the alternate north-south oriented schematic below
Alternate Schematic Link: North-South orientation
Textures: Faithful 32x32
Shaders: SEUS

All my projects are licensed under Creative Commons Attribution-NonCommercial 4.0 International License
[That means appropriate credit given (saying 'By Snaves on PMC' and/or a link to the original project would suffice) and not for commercial use]
Download the east-west oriented schematic using main link on right and the alternate north-south oriented schematic below
Alternate Schematic Link: North-South orientation
Textures: Faithful 32x32
Shaders: SEUS

All my projects are licensed under Creative Commons Attribution-NonCommercial 4.0 International License
[That means appropriate credit given (saying 'By Snaves on PMC' and/or a link to the original project would suffice) and not for commercial use]
1 Update Logs
Update #1 : by Snaves 01/23/2015 5:52:34 pmJanuary 23, 2015 @ 10:52 pm UTC
- Fixed original east-west oriented bridge schematic
- Uploaded alternate north-south oriented schematic
- Uploaded alternate north-south oriented schematic
More like this
3178845
2


Have something to say?